Building construction involves a huge quantity of material and budget. After plannig and structural detailing finished, these details are transferred into the building estimator.
The building estimation will estimate the material quantity, quantity of different items of works, and prepare an abstract sheet that shows the cost of building construction.
If financial resources are limited, we will need to seek pre-approval for loans in advance, or else you might end up in a cash crunch situation.
This is important work to do after the project is ready to be executed. For that, we must take permission from different boards before you can go for the construction, like this municipal, airport authority, pollution control, etc.
Following are the list of document project required before applying for permission. This document may differ from state to state, but a few are essential for every building construction work.
- Land Survey
- Soil test report (SBC report)
- All drawing like Plan, Elevation, Section
- Structural Certificate.
- Architect Certificate.